Contact us
← Back to NOVRISK.
Sector · Industry

Operators of classified sites,
your crisis framework and its exercises

Your instructions are written and your three-yearly exercise is held. We bring in scenarios your instructions have never had to handle, and they come out changed.

Assess your plan in fourteen questions Talk to an expert Qualiopi-certified training organisation TRACE® and COMPACTRAIN® methods
01Our support

Your internal operation plan,
workable with reduced staff.

Your internal operation plan is written and exercised. We test it against the staff actually on site, and make it workable with that staffing level.

Analyse01 to 03

01From detection to activation

See details

Your instruction sets who activates the plan and on what basis. We trigger an incident outside working hours and record the time of activation, then the time of the first situation update. The time lost between the two goes back into your instruction.

02The limit of delegated authority in the field

See details

Your instruction delegates part of the make-safe actions to the operator on site. We put that delegation in a situation that reaches its limit, and record what they commit to alone and what they call for. Your managers see where the delegation holds and where it needs an order.

03Your incidents, traced back to the cause

See details

Your incidents are reported and analysed, near misses included. We go over that analysis with your teams to move from immediate causes to the conditions that allowed them: organisation, workload, flow of information. These root causes become the scenario for your next exercise.

Equip04 to 09

04The lone operator's instruction

See details

Your instructions set the order of the first actions: assess, make safe, raise the alarm, then tackle the incident. We have a lone operator work through that order in session, and record the time of each action. You get the real duration of the phase before back-up arrives.

05The status of zones and access points

See details

Your supervision system holds the zoning, access rights and required equipment. With you, we prepare what takes over when it goes down, workable by the smallest staffing level. Your command post keeps control of access without it.

06Handing over to the emergency services

See details

When they arrive, your resources come under the coordination of the incident commander. With your teams, we settle what they pass on and in what form, then test it in session. The handover happens with no loss of time or information.

07Alerting the outside world, before the emergency services

See details

Your framework provides for alerting local residents and cutting off utilities, and it designates who decides on them. We place these decisions in the time between the event and the arrival of the emergency services, and record what signal sets each one off. Your management leaves the session with its delegations tested on that moment.

08The site command post

See details

Your command post is set up around the site map and its zoning. We review its equipment with the teams who staff it, so that it remains usable when the supervision system is silent. Your on-call manager runs the event with the post's own resources.

09Assumptions kept up to date during the event

See details

One group works on what comes next while operations handle the event. It keeps the assumptions up to date and names the resources to deploy, hour by hour. Extreme weather events and drone overflights are part of it.

Test10 to 13

10The internal operation plan exercise

See details

Your internal operation plan is exercised every three years. We run the session with the staff actually present, through to informing the prefecture and the inspectorate. We link it with the off-site emergency plan exercise organised by the prefect.

11The no-damage incident exercise

See details

A near miss mobilises your organisation differently from an actual incident. We play one out in session, and observe what your teams do with it at the time, then what they hand over to the next shift. You see what your framework retains from an event that caused no damage.

12The precautionary shutdown exercise

See details

Control switches to manual. You shut down units as a precaution, and we record which ones and who decides. We also look at how that decision is debated in the room, and your management tests its shutdown criteria against it.

13Supervision blind, plant still running

See details

Your plant can keep running while the supervision system stays silent. We play out this situation with the on-call team, starting from your degraded-mode operating instructions, and record what information they rely on to decide. Your rules for operating blind come out tested on a real case.

Sustain14 and 15

14Action tracking the inspectorate checks

See details

Your action plan covers the gaps found in exercises and inspections. We reopen each line with its owner at the next session, to establish what is done and what remains open. You go into the classified installations inspection with an up-to-date status.

15Keeping things operational at the site's pace

See details

Your crisis unit, its tools and your instructions move at the pace of the site, where installations evolve, teams rotate and delegations change. We keep it all operational with you between two regulatory exercises, from the make-up of the crisis unit to the quick-reference sheets, the directory and the command post. Your framework stays in step with the site as it is.

02The inventories

Two accidents out of three
remain without a root cause.

Over the last four years recorded by the French bureau for the analysis of industrial risks and pollution (BARPI), the root cause was identified in a third of accidents at classified installations. Yet the same bureau's analysis grid offers thirteen categories of root cause.

Site operations and management work out these answers with us, and the session is then built on them.
  • At what threshold is the internal operation plan activated, and who makes the call?
  • Who answers outside working hours, and how quickly is the crisis unit up and running?
  • What does the crisis information file give you when the information system is unavailable?
  • Where are decisions logged, and who closes the gaps from the last exercise?
Thirty-five accidents in a hundred reveal their root cause Classified installations, share of root causes identified in 2025 Hover over a year for its rate
The rate peaks at 39 %, reached in 2022. 2022 39 % 2023 30 % 2024 34 % 2025 35 %

Inventories of technological accidents, 2024 and 2026 editions.

03Your two plans

The plan you hold and the one the prefect holds
are not exercised together.

Between the two comes the moment when the prefect takes command of operations. We bring it into your three-yearly exercise, so that your teams know it before they live through it in front of the prefecture.

The internal operation plan

Article R. 181‑54 of the French Environmental Code requires a test at intervals not exceeding three years. At lower tier, the plan has been mandatory since 1 January 2023.

The off-site emergency plan

Article R. 741‑29 of the French Internal Security Code requires it to be revised at least every five years, reduced to three for certain installations.

Exercises run by the prefect

Article R. 741‑32 of the same code sets a maximum interval of five years, reduced to three for the same installations, and your site is played out in them with the emergency services.

Accident reporting

Article R. 512‑69 of the Environmental Code requires a report and an analysis, and the risk analysis bureau's grid offers thirteen categories of root cause.

04How the engagement runs

Five stages,
from your classified installations to the action plan.

We record response times during scoping, gaps during reconnaissance, how the tools hold up during writing and decision times during testing. The action plan takes up these findings and gives each a deadline.

See our method in detail ›

05What your teams handle on their own

An on-call team that stands itself up.

The time between detection and plan activation has been recorded outside working hours, and the person alone on site has their quick-reference sheet.

  • 01A dated activation time: the time between detection and plan activation has been recorded outside working hours, and it becomes the benchmark for the next exercise.
  • 02The lone worker's quick-reference sheet: whoever is alone on site knows what they commit to, whom they call, and what they tell the emergency services.
  • 03A crisis unit reading the same picture: each seat has its quick-reference sheet, the situation board is on the wall, and the method holds on the day the network goes down.
  • 04Gaps closed: each one has an owner, a date, and evidence that the correction was made.
An operator, seen from behind, reviews a reading on his computer in front of the plant units at dusk

How quickly would your on-call team respond outside working hours?

The fourteen-question self-assessment positions your internal operation plan, free of charge and with no sign-up. The audit then tells you which service to start with.

Assess your plan in fourteen questions Talk to an expert Qualiopi-certified training organisation